Assign a Timesheet Supervisor to a Project

Configure timesheet settings for a project to assign a timesheet supervisor to the project.

To configure timesheet supervisor:

  1. Navigate to the project settings page
  2. Select the Timesheets tab.
  3. In the Timesheet Supervisors section, select Add .
  4. In the Add Supervisors dialog box, select a supervisor, select Move Right to move it to the selected list, and then select Select.
  5. Select the Default option to select one of the supervisors as the default timesheet supervisor.

    Notes:

    • A project user must have the Supervise Timesheets global permission enabled to be assigned as a timesheet supervisor.
    • A project can have multiple timesheet supervisors, but only one can be selected as the default supervisor.
    • To delete a timesheet supervisor, select a supervisor, select the Context menu, and then select Delete. The default timesheet supervisor cannot be deleted.
  6. Select Save.