Assign a Timesheet Supervisor to a Project
Configure timesheet settings for a project to assign a timesheet supervisor to the project.
To configure timesheet supervisor:
- Navigate to the project settings page
- In the object selector, select ﱆ Project, select View Projects List, and then select a project name.
- From the Main Menu, select Summary & Settings.
- On the Summary & Settings page, select Settings.
- Select the Timesheets tab.
- In the Timesheet Supervisors section, select Add .
- In the Add Supervisors dialog box, select a supervisor, select Move Right to move it to the selected list, and then select Select.
- Select the Default option to select one of the supervisors as the default timesheet supervisor.
Notes:
- A project user must have the Supervise Timesheets global permission enabled to be assigned as a timesheet supervisor.
- A project can have multiple timesheet supervisors, but only one can be selected as the default supervisor.
- To delete a timesheet supervisor, select a supervisor, select the Context menu, and then select Delete. The default timesheet supervisor cannot be deleted.
- Select Save.