Assign a CBS Code and Cost Category to a Risk
By assigning a CBS code and a CBS cost category, both pre-response and post-response cost impacts are made available on the project's cost sheet.
You cannot assign a CBS code or cost category to program risks, but you can assign them to project risks in the program context.
To assign a CBS code and a cost category to a risk:
- In the object selector, select ﱆ Project or Program, and then select a project or a program from the list.
- From the Main Menu, select Risk, and then select Risk Register.
- In the table, select a risk.
- In the CBS Code and Cost Category columns, select a CBS code and a cost category for the risk.
- Select Save.
Tips
- The CBS Code value can also be entered in the General detail window.
Last Published Wednesday, October 16, 2024